Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Artigo
|
动态生产计划下多工序柔性制造系统预防维护决策祝米鑫 ; 葛亚雄 ; 周晓军上海交通大学学报, 2020-11, Vol.54 (11), p.1124-1133上海交通大学 机械与动力工程学院,上海 200240Texto completo disponível |
|
2 |
Material Type: Artigo
|
Multi-Site Aggregate Production Planning Using Particle Swarm OptimizationWibawa, Aji Prasetya ; Mahmudy, Wayan F ; Rizki, Agung Mustika ; Yuliastuti, Gusti Eka ; Tama, Ishardita PambudiJournal of Engineering, Project, and Production Management, 2022-01, Vol.12 (1), p.062-069 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
3 |
Material Type: Artigo
|
Adaptive variable voltage vectors switching table in direct torque control for PMSMLi, Yao-hua ; Yang, Qi-dong ; Qu, Ya-fei ; Shi, Hao-hao ; Meng, Xiang-zhen ; Jiao, SenDianji yu Kongzhi Xuebao = Electric Machines and Control, 2019-01 (9) [Periódico revisado por pares]Harbin: Harbin University of Science and TechnologyTexto completo disponível |
|
4 |
Material Type: Artigo
|
Research progress in soil texture spatial prediction methods based on remote sensing technologyWang, Tiantian ; Ding Qixun ; Shuai, Mei ; Tang Mengmeng ; Jiang Wenjuan ; Wang, Qiang ; Ma, YouhuaJournal of agricultural resources and environment, 2023-01, Vol.40 (6), p.1415 [Periódico revisado por pares]Tianjin: Journal of Agricultural Resources and Environment (JARE)Texto completo disponível |
|
5 |
Material Type: Artigo
|
A parameter optimization method of dual active bridge converter considering the worst conditionsLiu, Ran ; Li, Kun-peng ; Xu, Lie ; Li, Yong-dongDianji yu Kongzhi Xuebao = Electric Machines and Control, 2019-01 (10) [Periódico revisado por pares]Harbin: Harbin University of Science and TechnologyTexto completo disponível |
|
6 |
Material Type: Artigo
|
Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop: Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shopAN, Yu-Wei ; YAN, Hong-SenZi dong hua xue bao, 2014-03, Vol.39 (9), p.1476-1491 [Periódico revisado por pares]Texto completo disponível |
|
7 |
Material Type: Artigo
|
Availability consideration in the optimal selection of multiple-aspect RMS configurationsYoussef, A. M. A. ; ElMaraghy, H. A.International journal of production research, 2008-11, Vol.46 (21), p.5849-5882 [Periódico revisado por pares]London: Taylor & Francis GroupTexto completo disponível |
|
8 |
Material Type: Artigo
|
Hybrid evolutionary multi-objective algorithms for integrating assembly sequence planning and assembly line balancingTseng, H.-E. ; Chen, M.-H. ; Chang, C.-C. ; Wang, W.-P.International journal of production research, 2008-11, Vol.46 (21), p.5951-5977 [Periódico revisado por pares]London: Taylor & Francis GroupTexto completo disponível |
|
9 |
Material Type: Artigo
|
Discretization Methods of a Rotating Flexible Rectangular Thin PlateFan, Jihua ; Zhang, Dingguo ; Shen, HongShanghai jiao tong da xue xue bao, 2020-02, Vol.25 (1), p.118-126 [Periódico revisado por pares]Shanghai: Shanghai Jiaotong University PressTexto completo disponível |
|
10 |
Material Type: Artigo
|
Block Principle Component Analysis with Lp-norm for Robust and Sparse ModellingTang, Ganyi ; Lu, GuifuShanghai jiao tong da xue xue bao. Yi xue ban, 2018-06, Vol.23 (3), p.398Shanghai: Shanghai Jiaotong University PressTexto completo disponível |