skip to main content
Visitante
Meu Espaço
Minha Conta
Sair
Identificação
This feature requires javascript
Tags
Revistas Eletrônicas (eJournals)
Livros Eletrônicos (eBooks)
Bases de Dados
Bibliotecas USP
Ajuda
Ajuda
Idioma:
Inglês
Espanhol
Português
This feature required javascript
This feature requires javascript
Primo Search
Busca Geral
Busca Geral
Acervo Físico
Acervo Físico
Produção Intelectual da USP
Produção USP
Search For:
Clear Search Box
Search in:
Busca Geral
Or select another collection:
Search in:
Busca Geral
Busca Avançada
Busca por Índices
This feature requires javascript
This feature requires javascript
Assessment of reasonability of production wells transfer to well workover stage
Gasumov, R. A. ; Gasumov, E. R.
SOCAR Proceedings, 2022-12 (4)
Sem texto completo
Citações
Citado por
Serviços
Detalhes
Resenhas & Tags
Nº de Citações
This feature requires javascript
Enviar para
Adicionar ao Meu Espaço
Remover do Meu Espaço
E-mail (máximo 30 registros por vez)
Imprimir
Link permanente
Referência
EasyBib
EndNote
RefWorks
del.icio.us
Exportar RIS
Exportar BibTeX
This feature requires javascript
Título:
Assessment of reasonability of production wells transfer to well workover stage
Autor:
Gasumov, R. A.
;
Gasumov, E. R.
É parte de:
SOCAR Proceedings, 2022-12 (4)
Descrição:
The article discusses predicting the critical parameters of production wells to assess the need to transfer them to well workover stage and put on the program of geological and technical measures (GTM). A methodology for substantiating and assessing the influence of critical values of reservoir parameters on the operation of production wells is presented. Three stages of transferring wells to workover are considered: geological, technological and analytical, and the procedure for assessing their effectiveness. The procedure for calculating the shut-in time of wells and gas losses during the transition of production wells to workover, determining the parameters of the technological regime after geological and technical measures are considered. A method has been developed for predicting the time of well shut-in due to flooding (self-killing) and assessing the timing of its operation with production flow rates at the final stage of field development. The results of the study of dependence of the critical height of the liquid column on the bottomhole pressure and the average daily flow rate of the Cenomanian well, the scheme for revealing the dependence of gas water contact level on the reservoir pressure and the volume of the sampled gas are presented. The procedure for calculating the technical and geological-production state of wells is considered according to the diagnostic rating assessment. Keywords: field; gas well; prediction; critical parameter; cenomanian; flooding; flow rate; pressure.
Idioma:
Inglês
This feature requires javascript
This feature requires javascript
Voltar para lista de resultados
This feature requires javascript
This feature requires javascript
Buscando em bases de dados remotas. Favor aguardar.
Buscando por
em
scope:(USP_PRODUCAO),scope:(USP_EBOOKS),scope:("PRIMO"),scope:(USP),scope:(USP_EREVISTAS),scope:(USP_FISICO),primo_central_multiple_fe
Mostrar o que foi encontrado até o momento
This feature requires javascript
This feature requires javascript